Tipo do documento: Dissertação
Título: METODOLOGIA PARA GERENCIAMENTO DE RISCOS EM PROJETOS DE TRANSMISSÃO DE ENERGIA ELÉTRICA COM FOCO NO PRAZO DE CONCLUSÃO APLICANDO O GERENCIAMENTO DE PROJETOS PELA CORRENTE CRÍTICA E SIMULAÇÃO DE MONTE CARLO
Título(s) alternativo(s): METHODOLOGY FOR RISK MANAGEMENT OF ELECTRIC ENERGY TRANSMISSION PROJECTS WITH FOCUS ON THE TIME FOR COMPLETION ADOPTING THE CRITICAL CHAIN AND MONTE CARLO SIMULATION FOR PROJECT MANAGEMENT
Autor: Pimentel, Jacinto Maia 
Primeiro orientador: Luz, Marta Pereira da
Primeiro membro da banca: Brandstetter, Maria Carolina Gomes de Oliveira
Segundo membro da banca: Machado, Ricardo Luiz
Resumo: A construção dos empreendimentos de geração de energia elétrica é realizada nos locais onde existem condições específicas para sua implantação, e, nem sempre estes são próximos aos centros consumidores. A energia gerada necessita ser transportada para os centros de consumo localizados a muitos quilômetros de distância, e, para tal são utilizadas as Linhas de Transmissão de Energia. Estes empreendimentos caracterizam-se por encontrar situações diversas e que impactam no seu prazo de conclusão. Com o objetivo de buscar opções de gerenciamento de projetos para que os prazos sejam alcançados, esta pesquisa aplica uma metodologia para gestão dos riscos em projetos, com a aplicação de análise quantitativa dos riscos. Será aplicada na área de transmissão de energia com foco no prazo de conclusão. O modelo proposto utiliza o método do Gerenciamento de Projeto pela Corrente Crítica – CCPM, por meio do qual as durações das atividades consideradas são aquelas exequíveis no menor prazo possível. O uso da CCPM prevê a introdução de buffers no cronograma do projeto para controlar as incertezas. A metodologia proposta aplica ao cronograma a Simulação de Monte Carlo- SMC, associando às suas atividades o prazo Mínimo, Mais Provável e Máximo. Os riscos identificados são associados às atividades. O resultado da aplicação da metodologia proposta é uma análise dos riscos do projeto indicando a probabilidade de consumo dos buffers, as atividades que mais impactam no seu consumo e os riscos associados a estas. O resultado desta análise é quantitativa e gera informações úteis para ações de contenção e contingência.
Abstract: The construction of electricity generation projects are held in places where there are specific conditions for its implementation, and it appears that these are not always close to the consumer markets. The energy needs to be transported to the consumption centers located many kilometers away, and to this end are used to power transmission lines. These developments are characterized by many different situations that impact on their time of completion. In order to pursue project management options so that deadlines are met, this research applies a risk management methodology for projects by means of the quantitative risk assessment. It is addressed to the energy transmission area with a focus on the project deadline. The proposed model adopts the Critical Chain Project Management – CCPM, whereby the appropriate activities duration are those achievable in the shortest time as possible. The use of CCPM calls for the application of buffers along the project schedule to control the uncertainties. The proposed methodology applies the Monte Carlo Simulation – MCS to the schedule, associating the Minimum, Most likely and Maximum times to the activities. The identified risks are related to these activities. The outcome resulting from the proposed methodology is quantitative and provides useful information to containment and contingency actions.
Palavras-chave: Linha de Transmissão de Energia, Gestão de Projetos, Gestão de Riscos, Caminho Crítico, Corrente Crítica, Buffers, Simulação de Monte Carlo.
Electric Energy Transmission Line, Project Management, Risk Management, Critical Path, Critical Chain, Buffers, Monte Carlo Simulation.
Área(s) do CNPq: ENGENHARIAS::ENGENHARIA DE PRODUCAO
Idioma: por
País: Brasil
Instituição: Pontifícia Universidade Católica de Goiás
Sigla da instituição: PUC Goiás
Departamento: Escola de Engenharia::Curso de Engenharia de Produção
Programa: Programa de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemas
Citação: Pimentel, Jacinto Maia. METODOLOGIA PARA GERENCIAMENTO DE RISCOS EM PROJETOS DE TRANSMISSÃO DE ENERGIA ELÉTRICA COM FOCO NO PRAZO DE CONCLUSÃO APLICANDO O GERENCIAMENTO DE PROJETOS PELA CORRENTE CRÍTICA E SIMULAÇÃO DE MONTE CARLO. 2016. 129 f. Dissertação (Programa de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemas) - Pontifícia Universidade Católica de Goiás, Goiânia - GO.
Tipo de acesso: Acesso Aberto
URI: http://tede2.pucgoias.edu.br:8080/handle/tede/3696
Data de defesa: 18-Out-2016
Aparece nas coleções:Mestrado em Engenharia de Produção e Sistemas

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
JACINTO MAIA PIMENTEL.pdfTexto Completo3,07 MBAdobe PDFThumbnail

Baixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.