Exportar este item: EndNote BibTex

Use este identificador para citar ou linkar para este item: http://tede2.pucgoias.edu.br:8080/handle/tede/3696
Registro completo de metadados
Campo DCValorIdioma
dc.creatorPimentel, Jacinto Maia-
dc.creator.Latteshttp://lattes.cnpq.br/7649036493169575eng
dc.contributor.advisor1Luz, Marta Pereira da-
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/5995967458007910eng
dc.contributor.referee1Brandstetter, Maria Carolina Gomes de Oliveira-
dc.contributor.referee1Latteshttp://lattes.cnpq.br/8038795637292636eng
dc.contributor.referee2Machado, Ricardo Luiz-
dc.contributor.referee2Latteshttp://lattes.cnpq.br/4103684476705320eng
dc.date.accessioned2017-06-01T13:24:39Z-
dc.date.issued2016-10-18-
dc.identifier.citationPimentel, Jacinto Maia. METODOLOGIA PARA GERENCIAMENTO DE RISCOS EM PROJETOS DE TRANSMISSÃO DE ENERGIA ELÉTRICA COM FOCO NO PRAZO DE CONCLUSÃO APLICANDO O GERENCIAMENTO DE PROJETOS PELA CORRENTE CRÍTICA E SIMULAÇÃO DE MONTE CARLO. 2016. 129 f. Dissertação (Programa de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemas) - Pontifícia Universidade Católica de Goiás, Goiânia - GO.eng
dc.identifier.urihttp://tede2.pucgoias.edu.br:8080/handle/tede/3696-
dc.description.resumoA construção dos empreendimentos de geração de energia elétrica é realizada nos locais onde existem condições específicas para sua implantação, e, nem sempre estes são próximos aos centros consumidores. A energia gerada necessita ser transportada para os centros de consumo localizados a muitos quilômetros de distância, e, para tal são utilizadas as Linhas de Transmissão de Energia. Estes empreendimentos caracterizam-se por encontrar situações diversas e que impactam no seu prazo de conclusão. Com o objetivo de buscar opções de gerenciamento de projetos para que os prazos sejam alcançados, esta pesquisa aplica uma metodologia para gestão dos riscos em projetos, com a aplicação de análise quantitativa dos riscos. Será aplicada na área de transmissão de energia com foco no prazo de conclusão. O modelo proposto utiliza o método do Gerenciamento de Projeto pela Corrente Crítica – CCPM, por meio do qual as durações das atividades consideradas são aquelas exequíveis no menor prazo possível. O uso da CCPM prevê a introdução de buffers no cronograma do projeto para controlar as incertezas. A metodologia proposta aplica ao cronograma a Simulação de Monte Carlo- SMC, associando às suas atividades o prazo Mínimo, Mais Provável e Máximo. Os riscos identificados são associados às atividades. O resultado da aplicação da metodologia proposta é uma análise dos riscos do projeto indicando a probabilidade de consumo dos buffers, as atividades que mais impactam no seu consumo e os riscos associados a estas. O resultado desta análise é quantitativa e gera informações úteis para ações de contenção e contingência.eng
dc.description.abstractThe construction of electricity generation projects are held in places where there are specific conditions for its implementation, and it appears that these are not always close to the consumer markets. The energy needs to be transported to the consumption centers located many kilometers away, and to this end are used to power transmission lines. These developments are characterized by many different situations that impact on their time of completion. In order to pursue project management options so that deadlines are met, this research applies a risk management methodology for projects by means of the quantitative risk assessment. It is addressed to the energy transmission area with a focus on the project deadline. The proposed model adopts the Critical Chain Project Management – CCPM, whereby the appropriate activities duration are those achievable in the shortest time as possible. The use of CCPM calls for the application of buffers along the project schedule to control the uncertainties. The proposed methodology applies the Monte Carlo Simulation – MCS to the schedule, associating the Minimum, Most likely and Maximum times to the activities. The identified risks are related to these activities. The outcome resulting from the proposed methodology is quantitative and provides useful information to containment and contingency actions.eng
dc.description.provenanceSubmitted by admin tede ([email protected]) on 2017-06-01T13:24:39Z No. of bitstreams: 1 JACINTO MAIA PIMENTEL.pdf: 3146885 bytes, checksum: d73d15b75ba44e1ab5fa45ebd06988f1 (MD5)eng
dc.description.provenanceMade available in DSpace on 2017-06-01T13:24:39Z (GMT). No. of bitstreams: 1 JACINTO MAIA PIMENTEL.pdf: 3146885 bytes, checksum: d73d15b75ba44e1ab5fa45ebd06988f1 (MD5) Previous issue date: 2016-10-18eng
dc.formatapplication/pdf*
dc.thumbnail.urlhttp://tede2.pucgoias.edu.br:8080/retrieve/11189/JACINTO%20MAIA%20PIMENTEL.pdf.jpg*
dc.languageporeng
dc.publisherPontifícia Universidade Católica de Goiáseng
dc.publisher.departmentEscola de Engenharia::Curso de Engenharia de Produçãoeng
dc.publisher.countryBrasileng
dc.publisher.initialsPUC Goiáseng
dc.publisher.programPrograma de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemaseng
dc.rightsAcesso Aberto
dc.subjectLinha de Transmissão de Energia, Gestão de Projetos, Gestão de Riscos, Caminho Crítico, Corrente Crítica, Buffers, Simulação de Monte Carlo.por
dc.subjectElectric Energy Transmission Line, Project Management, Risk Management, Critical Path, Critical Chain, Buffers, Monte Carlo Simulation.eng
dc.subject.cnpqENGENHARIAS::ENGENHARIA DE PRODUCAOeng
dc.titleMETODOLOGIA PARA GERENCIAMENTO DE RISCOS EM PROJETOS DE TRANSMISSÃO DE ENERGIA ELÉTRICA COM FOCO NO PRAZO DE CONCLUSÃO APLICANDO O GERENCIAMENTO DE PROJETOS PELA CORRENTE CRÍTICA E SIMULAÇÃO DE MONTE CARLOeng
dc.title.alternativeMETHODOLOGY FOR RISK MANAGEMENT OF ELECTRIC ENERGY TRANSMISSION PROJECTS WITH FOCUS ON THE TIME FOR COMPLETION ADOPTING THE CRITICAL CHAIN AND MONTE CARLO SIMULATION FOR PROJECT MANAGEMENTeng
dc.typeDissertaçãoeng
Aparece nas coleções:Mestrado em Engenharia de Produção e Sistemas

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
JACINTO MAIA PIMENTEL.pdfTexto Completo3,07 MBAdobe PDFThumbnail

Baixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.