Exportar este item: EndNote BibTex

Use este identificador para citar ou linkar para este item: http://tede2.pucgoias.edu.br:8080/handle/tede/4212
Registro completo de metadados
Campo DCValorIdioma
dc.creatorMarques, Ana Carolina Amaral-
dc.creator.Latteshttp://lattes.cnpq.br/3464893107632718eng
dc.contributor.advisor1Silva, Solange da-
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/4312855865010981eng
dc.contributor.referee1Guimarães, Marlos José Ribeiro-
dc.contributor.referee1Latteshttp://lattes.cnpq.br/3953309887188837eng
dc.contributor.referee2Pasqualetto, Antonio-
dc.contributor.referee2Latteshttp://lattes.cnpq.br/4691515540448143eng
dc.date.accessioned2019-05-02T17:17:08Z-
dc.date.issued2019-03-12-
dc.identifier.citationMarques, Ana Carolina Amaral. Planejamento e Controle de Obra Integrado ao Bim, com Foco no Processo de Conhecimento. 2019. 106 f. Dissertação (Programa de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemas) - Pontifícia Universidade Católica de Goiás, Goiânia-GO.eng
dc.identifier.urihttp://tede2.pucgoias.edu.br:8080/handle/tede/4212-
dc.description.resumoEsta pesquisa considerou-se que na maioria das vezes a implantação da modelagem da informação da construção (BIM) 4D não tem o resultado esperado por falta de conhecimento da equipe sobre o modelo que estava sendo implantado. Diante disto, este trabalho teve como objetivo principal aplicar o sistema BIM 4D por meio das ferramentas Excel, MS Project, Revit, Navisworks e Synchro, voltados para o planejamento e controle de obras da construção civil, com foco no processo de conhecimento. A abordagem metodológica adotada na pesquisa foi qualitativa integrada com a análise fenomenológica. A avaliação do modelo foi feita em um estudo de caso em obra de grande porte do setor de edificações residencial alto padrão em Goiânia-GO. Foi possível, através da análise dos resultados e considerações finais, principalmente: detectar as vantagens e desvantagens dos softwares Navisworks e Synchro; mostrar os desafios que a construção organizacional pode encontrar enquanto o BIM se transforma no domínio do desenvolvimento, implantação e utilização, no cronograma físico da obra; demonstraram que não é a falta de conhecimento que dificulta a implantação do sistema, mas sim as questões culturais.eng
dc.description.abstractThis research considered that, very often, the implementation of the BIM 4D Construction Information Modeling (BIM) did not delivery the expected modeling results, mainly, due to lack of knowledge of the modeling team about the BIM model that was being implemented. Therefore, this research had as main point the application of the BIM 4D system through Excel, MS Project, Revit, Navisworks and Synchro, focused on the planning and control of construction works, focusing on the knowledge process. The methodological approach adopted in this research was qualitative integrated with the phenomenological analysis. The evaluation of the constructed model was made in a large-scale case study of a high standard residential building in Goiânia-GO. The research indicated that, through the analysis of the modeling results and final considerations, it was possible to detect the advantages and disadvantages of the software Navisworks and Synchro. It was also possible to present the challenges that the organizational construction can face while BIM becomes the domain of development, implementation and utilization, on the work scheduling. Additionally, the analysis of the modeling results and final considerations also demonstrated that it is not the lack of knowledge that makes implantation of the system difficult, but rather the cultural issues.eng
dc.description.provenanceSubmitted by admin tede ([email protected]) on 2019-05-02T17:17:08Z No. of bitstreams: 1 Ana Carolina Amaral Marques.pdf: 3053200 bytes, checksum: 67e86a91874e629bee1233b798b23e09 (MD5)eng
dc.description.provenanceMade available in DSpace on 2019-05-02T17:17:08Z (GMT). No. of bitstreams: 1 Ana Carolina Amaral Marques.pdf: 3053200 bytes, checksum: 67e86a91874e629bee1233b798b23e09 (MD5) Previous issue date: 2019-03-12eng
dc.formatapplication/pdf*
dc.thumbnail.urlhttp://tede2.pucgoias.edu.br:8080/retrieve/13294/Ana%20Carolina%20Amaral%20Marques.pdf.jpg*
dc.languageporeng
dc.publisherPontifícia Universidade Católica de Goiáseng
dc.publisher.departmentEscola de Engenharia::Curso de Engenharia de Produçãoeng
dc.publisher.countryBrasileng
dc.publisher.initialsPUC Goiáseng
dc.publisher.programPrograma de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemaseng
dc.rightsAcesso Aberto
dc.subjectModelagem de informações de construção; BIM 4D; Planejamento e controle de obras; Processo de conhecimento.por
dc.subjectBuilding Information Modeling; BIM 4D; Planning and control of works; Knowledge process.eng
dc.subject.cnpqENGENHARIAS::ENGENHARIA DE PRODUCAOeng
dc.titlePlanejamento e Controle de Obra Integrado ao Bim, com Foco no Processo de Conhecimentoeng
dc.typeDissertaçãoeng
Aparece nas coleções:Mestrado em Engenharia de Produção e Sistemas

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Ana Carolina Amaral Marques.pdfTexto Completo2,98 MBAdobe PDFThumbnail

Baixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.