Exportar este item: EndNote BibTex

Use este identificador para citar ou linkar para este item: http://tede2.pucgoias.edu.br:8080/handle/tede/3971
Registro completo de metadados
Campo DCValorIdioma
dc.creatorCenteno, Hugo Alexandre do Carmo-
dc.creator.Latteshttp://lattes.cnpq.br/1918302209417571eng
dc.contributor.advisor1Menezes, José Elmo de-
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/9654702573176547eng
dc.contributor.referee1Carrijo, Elias Calixto-
dc.contributor.referee1Latteshttp://lattes.cnpq.br/5740077973313846eng
dc.contributor.referee2Carmo, Iran Martins do-
dc.contributor.referee2Latteshttp://lattes.cnpq.br/2418951329099161eng
dc.date.accessioned2018-05-14T19:00:50Z-
dc.date.issued2018-04-04-
dc.identifier.citationCenteno, Hugo Alexandre do Carmo. MODELAGEM DE CRONOGRAMA DE PROJETO PELA FERRAMENTA DSM COM APOIO AO GERENCIAMENTO E TOMADA DE DECISÕES PELA SIMULAÇÃO DE MONTE CARLO. 2018. 103 f. Dissertação (Programa de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemas) - Pontifícia Universidade Católica de Goiás, Goiânia-GO.eng
dc.identifier.urihttp://tede2.pucgoias.edu.br:8080/handle/tede/3971-
dc.description.resumoOs atrasos em projetos de construção civil são um fato recorrente em diversos países e regiões para os mais variados tipos de obras. Esses atrasos, além de impactar negativamente a imagem das empresas contratadas na prestação de serviços de construção, acarretam diversos prejuízos financeiros às partes interessadas: contratante e contratado. Diversas pesquisas que abordam os fatores que acarretam em atrasos no cronograma de obras elencam a variação na duração das atividades e, ou, a falta de estimativa inadequada para duração das atividades, dentre os dez maiores fatores de atraso nos projetos. Contribuem para a inadequada estimativa de produção das atividades o desconhecimento da complexidade das mesmas e, também, a falta ou insuficiência de dados históricos que permitam estimar com segurança a duração das atividades. Assim, este trabalho visa descrever o comportamento de variabilidade na duração das atividades em um ambiente com poucos dados de produtividade das atividades. Os dados de produtividade analisados foram tomados de três projetos de construção civil semelhantes executados pela mesma empresa e que se prestaram como estudos de caso deste trabalho. Para análise da variabilidade e descrição do comportamento das atividades, após a coleta de dados de produtividade das atividades dos projetos, foram utilizadas como técnicas a reamostragem Bootstrap não paramétrica dos dados associada a Simulação de Monte Carlo (SMC). Posteriormente, para verificar a confiabilidade dos resultados de variação na duração das atividades, o cronograma dos estudos de caso foi modelado utilizando o Método do Caminho Crítico (CPM) e a Matriz de Estrutura de Dependência (DSM); e submetido a SMC. Os resultados simulados de duração total dos projetos mostraram-se adequados ao prazo real de conclusão dos projetos estudados, conduzindo à conclusão de que os resultados de variação na duração das atividades, obtidos pela técnica citada, são confiáveis.eng
dc.description.abstractDelays in construction projects are a recurrent fact in several countries and regions for the most varied types of works. These delays, in addition to negatively impacting the image of companies contracted in the provision of construction services, cause several financial losses to interested parties: contractor and hired. Several researches that address the factors that lead to delays in the work schedule indicate the variation in the duration of the activities and, or the lack of an inadequate estimate for the duration of the activities, among the ten major delay factors in the projects. They contribute to the inadequate estimation of production of the activities, the lack of knowledge of the complexity of the activities, and also the lack or insufficiency of historical data that allow a safe estimate of the duration of the activities. Thus, this study aims to describe the behavior of variability in the duration of activities in an environment with little activity productivity data. The productivity data analyzed were taken from three similar construction projects carried out by the same company and which were provided as case studies of this work. For the analysis of the variability and description of the behavior of the activities, after the data collection of productivity of the project activities, the non-parametric Bootstrap data resampling associated with Monte Carlo Simulation (MCS) was used as techniques. Later, in order to verify the reliability of the results of variation in the duration of the activities, the schedule of the case studies was modeled using the Critical Path Method (CPM) and the Dependency Structure Matrix (DSM); and submitted to MCS. The simulated results of the total duration of the projects were adequate for the actual completion period of the projects studied, leading to the conclusion that the results of variation in the duration of the activities obtained by the cited technique are reliable.eng
dc.description.provenanceSubmitted by admin tede ([email protected]) on 2018-05-14T19:00:50Z No. of bitstreams: 1 HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5)eng
dc.description.provenanceMade available in DSpace on 2018-05-14T19:00:50Z (GMT). No. of bitstreams: 1 HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5) Previous issue date: 2018-04-04eng
dc.formatapplication/pdf*
dc.thumbnail.urlhttp://tede2.pucgoias.edu.br:8080/retrieve/12300/HUGO%20ALEXANDRE%20DO%20CARMO%20CENTENO.pdf.jpg*
dc.languageporeng
dc.publisherPontifícia Universidade Católica de Goiáseng
dc.publisher.departmentEscola de Engenharia::Curso de Engenharia de Produçãoeng
dc.publisher.countryBrasileng
dc.publisher.initialsPUC Goiáseng
dc.publisher.programPrograma de Pós-Graduação STRICTO SENSU em Engenharia de Produção e Sistemaseng
dc.rightsAcesso Aberto
dc.subjectConstrução civil – Estimativas – Projetos. Métodos de simulação. Monte Carlo, Método de.por
dc.subjectConstruction - Estimates - Projects. Simulation methods. Monte Carlo, Method of.eng
dc.subject.cnpqENGENHARIAS::ENGENHARIA DE PRODUCAOeng
dc.titleMODELAGEM DE CRONOGRAMA DE PROJETO PELA FERRAMENTA DSM COM APOIO AO GERENCIAMENTO E TOMADA DE DECISÕES PELA SIMULAÇÃO DE MONTE CARLOeng
dc.typeDissertaçãoeng
Aparece nas coleções:Mestrado em Engenharia de Produção e Sistemas

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
HUGO ALEXANDRE DO CARMO CENTENO.pdfTexto Completo1,03 MBAdobe PDFThumbnail

Baixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.